Dysart Mining Camp, Dysart Qld

Completed in November 2011 the Dysart Mining Camp located in central Queensland was designed to accommodate 180 local workers in single unit dwellings. Each unit comprises of a bedroom, study and ensuite with an adjoining deck. After being prefabricated in Yatla, each unit was moved on site by Hutchinson Builders.

MDA Consulting Engineers was engaged by the John R Keith Group to assist with the hydraulic ecgineering services.

Skills

Posted on

June 9, 2020