Completed in November 2011, the Dysart Mining Camp located in central Queensland was designed to accommodate 180 local workers in single unit dwellings. Each unit comprises of a bedroom, study and ensuite, with an adjoining deck. After being prefabricated in Yatala, each unit was moved on site by Hutchinson Builders.
MDA Consulting Engineers was engaged by the John R Keith Group to assist with the hydraulic engineering services.